Happy holidays ENJOY 30% OFF PLUS FREE SHIPPING ON ALL IN-STOCK FLAGPOLE KITS AUTOMATICALLY!

Ground Sleeve Installation Instructions


Download PDF Installation Instructions

 

 

TOOLS & MATERIALS NEEDED:

  • POST HOLE DIGGER/SHOVEL
  • LEVEL
  • TAPE MEASURE
  • MIXING CONTAINER
  • 80lbs. + OF QUICK SETTING CEMENT
  • APPROX. 3” OF GRAVEL

     

    STEP 1. SELECT FLAGPOLE LOCATION. CALL 811 BEFORE YOU DIG. CHECK FOR UNDERGROUND SPRINKLERS, WATER LINES AND ELECTRICAL LINES (MAKE SURE YOUR FLAG HAS CLEARANCE TO FLY IN ALL DIRECTIONS)

    STEP 2. DIG A HOLE APPROX. 26” DEEP BY 12” IN DIAMETER (26”L x 12”W)

    STEP 3. PLACE APPROX. 3” OF GRAVEL IN HOLE (ALLOWS FOR DRAINAGE)

    STEP 4. PLACE ALUMINUM GROUND SLEEVE BEAD DOWN INTO GRAVEL—TO PREVENT CONCRETE FROM FLOWING INSIDE

    STEP 5. MIX CEMENT AND POUR AROUND GROUND SLEEVE. REPEAT UNTIL HOLE IS FILLED (IT’S OK TO HAVE YOUR GROUND SLEEVE AN INCH OR TWO ABOVE GROUND LEVEL—FILLING IN WITH MULCH, DIRT, FLOWER BED)

    STEP 6. INSERT POLE SECTION INTO GROUND SLEEVE (CAREFULLY—CEMENT WILL BE WET) SWEDGE END UP, USE A LEVEL TO MAKE SURE POLE IS STRAIGHT

    REMOVE POLE SECTION AFTER LEVEL, CONCRETE MUST CURE FOR AT LEAST 24 HRS

    STEP 7. ASSEMBLE FLAGPOLE. SEE ASSEMBLY INSTRUCTIONS FOR THE FLAGPOLE MODEL THAT YOU HAVE.

    STEP 8. INSERT FLAGPOLE INTO GROUND SLEEVE. ENJOY OLD GLORY! 


    FOR PARTS AND SERVICE:

    EZPOLE FLAGPOLES/ 1489 EAST 363RD STREET/ EASTLAKE, OHIO 44095

    TOLL FREE: 888-454-9164/ LOCAL: 440-951-1011/ FAX: 440-951-2933/ www.ezpole.com

    Close (esc)

    Happy Holidays

    Shop online and use discount code HOLIDAY30 to receive 30% off your entire order! Free shipping on all Flagpole Kits!

    Shop Now

    Age verification

    By clicking enter you are verifying that you are old enough to consume alcohol.

    Search

    Shopping Cart

    Your cart is currently empty.
    Shop now